estudio ji architects
 
  _architecture  
   
  < previous // next > return

home

 
High performance sports center. Paddle and tennis. Griñón, Madrid
 
architects: jorge frías/irene zurdo
typology: sports equipment
class: competitive bidding
date: 06/2010
client/sponsor: clack-fix
photos / images: estudioji
 
Second Prize!!
 
 

The project is organized by the modular system of gear and links multiplied that form the various bodies that organize applications.
It is a chained system that is capable of deformable infinitely extended and adapted to each other and generating spaces unit sets as required.
The module is based on the link of a bicycle chain, where each "depends" on another and together form a whole to form large surfaces.
This system, as compact or fluffy, form public spaces (areas) or unit (local).

 
 
 


 

A single geometric piece will allow mass production thereof is expandable building in the following phases. So being a geometric system is perfect for producing engarzable through industrialization serially produced from a single mold, since they all share the same radius of curvature, both facades and enclosures as covered slabs. It becomes transportable pieces, saving the maximum execution times.

 
 
 
 
 
 
 
 
 
 
 
 
up ˆ
 
 
 
architecture
interiors
design
packs _a_in_d
synthesis
*
awards
press
team/study
contact
*
news
facebook
twitter
*
ladepuradora

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  All rights reserved // © estudio ji architects /// Legal Advise // Design & Development: estudio ji